Holiday Update:
Fiber Optic Center will be closed December 24 and 25.
Due to potential early carrier pickups, PLEASE HAVE ALL ORDERS IN BY NOON ON MONDAY, DECEMBER 23.


We will resume our regular business hours on Thursday, December 26.

Fiber Optic Center will be at Photonics West - Schedule your meeting with a member of the FOC team now

Fiber Connect

Visit Fiber Optic Center at Booth 1068 During Fiber Connect 2024

Booth Schedule Includes Product Demonstrations and One-on-One Discussions

Meet with the Fiber Optic Center Technical Team

The FOC Technical Team will host several booth discusssions on the topic of fiber’s critical role in the physical layer of telecom networks for over forty years.

Discussion topics include:

  • Why cable end preparation is critical
  • How to determine the condition and possible limitations of original installed cables, multimode fiber or earlier generation single mode fiber
  • Knowing the cable standards and specifications of your installation and environment
  • How the cross-sectioning service identifies and isolates problems related to fiber optic terminations otherwise invisible.
  • The Ferrule, the most important component of a fiberoptic Connector, and the different types explained.
  • Termination of a standard epoxy and polish ferrule: when you have to connect in the field
  • Proper tool selection for fiber cable prep and termination In the field

Meet with a member of the Fiber Optic Center Technical Team

Sign up for a one-on-one discussion with one of our Fiber Optic Center Technical Experts below to discuss how to enhance process, results, and fiber optic cable assemblies.

  • Mario Goduco
  • Dan Rocheleau
  • Ron Schutjens
  • Kevin Mooney

Meet with Fiber Optic Center Technical Team

Technical Process & Product Demonstrations:

  • Cable Prep
  • Material Selection (Fiber & Cable and Furcation Tubing)
  • Cable and Fiber Stripping Best Practices
  • Epoxy and Adhesive Selection
  • Hand Tools Selection (Strippers, Shears, Scribes)
  • Crimping
  • Splicing, Cleaving (Fusion Splicers)
  • Polishing, Terminations, Supplies and Lapping Film
  • Cleaning (Test and Inspection)

Meet with David Sylvia, Director of Sales

Sign up today and schedule your meeting with David Sylvia while at Fiber Connect. To sign up, click YES and select to meet either July 29-30 and choose the time that works with your schedule.